Quick Guide
2
English
2.1
Check list for installation and startup
Notes for installation
• Valve position at delivery
– Hydraulic compensation valves have an opening degree of 50%
– Flushing valves are closed (opening degree 0%)
• All cable connections must be sufficiently tightened.
• For the clear identification of the Hycleen valves we recommend removing one of the stickers
from each valve and attaching it directly to the corresponding position on the system diagram
or to a piece of paper and adding a clear label (for example the thread name).
Notes before startup
Î The setting of the circulation pump must be checked and adjusted accordingly. Ideally, it should
be set to static to keep the differential pressure constant and the volume flow variable (semi-
automatic).
Î Check the temperature settings and state of the water heater. It must provide enough hot water.
Î Make sure that all valves, sensors and Controller connected to the Hycleen automation system
are recognized.
2.2
Download support documents & instructions
The following documents are available for download on the homepage of GF Piping Systems under
Hycleen Automation System (scroll all the way down).
https://www.gfps.com/com/en/products-solutions/systems/hycleen-automation-system.html
8
• Instruction manual
• Short instructions for commissioning
• Short instructions for operation
(status analysis, optimisation and data storage)
• Questions/Answers & Alarms