Télécharger Imprimer la page

AGA Marvel Professional MP36BF2 Instructions D'installation page 29

Publicité

Les langues disponibles

Les langues disponibles

Performance Checklist
□ Verify cabinet size.
□ Verify electrical supply and water supply
(if applicable).
□ Install anti-tip device(s) and verify unit is
secure.
□ Position unit in cutout, level at desired
height and secure unit.
□ Plug-in unit and verify operation.
□ Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
All manuals and user guides at all-guides.com
□ Align/square door(s).
□ Verify drain pan is properly installed and
□ Install kickplate.
□ Remove internal packaging and labels and
Installer's information:
Installer's name:
Installer's company:
Date:
29
there are no leaks on water connection.
wipe unit down.
_____________________________
_________________________
________________________________________

Publicité

loading