Télécharger Imprimer la page

Tripp-Lite SmartRack SRW U Serie Manuel D'utilisation page 7

À fixation murale non oscillantes

Publicité

Les langues disponibles

Les langues disponibles

29
7. Equipment Installation
28
Warning: Do not install equipment until you have stabilized the enclosure. Install heavier equipment first towards the bottom of
the enclosure. Install equipment starting from the bottom of the enclosure and proceed toward the top of the enclosure - never
the reverse. If using sliding equipment rails, be careful when extending the rails. Do not extend more than one set of sliding
27
equipment rails at one time. Avoid extending sliding equipment rails near the top of the enclosure.
Note: The unit comes with two different kinds of screws for equipment installation, black and silver. Use the black mounting screws if you are securing your
26
equipment to the square hole side of the mounting rail. Use the silver screws if you are securing your equipment to the tapped hole side of the mounting rail.
Note: The square holes in the middle of each rack unit are numbered and also include a small notch to aid identification. A single rack unit includes the space
occupied by the numbered hole and the holes directly above and below.
25
24
24
23
7.1 Installing or Removing Cage Nuts
22
WARNING: The flanges of the cage nuts should engage the sides of the square opening in the rail, not the top and bottom. Follow
the instructions in your equipment documentation to ensure proper installation of your equipment.
21
1
Locate the numbered square openings in the mounting rails where you plan to install your
equipment. You will install cage nuts (included) into the square openings in order to provide an
attachment point for the mounting screws (included). Note: Consult your equipment
20
documentation to determine how many cage nuts will be required and where they will need to
be installed.
19
From the inside of the mounting rail, insert one of the flanges of the cage nut through the
2
18
square opening. Press it against the side of the square opening. Each flange should engage one
side of the square opening, not the top or bottom.
Compress the cage nut at the sides slightly to allow the remaining flange to fit through the
3
square opening. When the cage nut is properly installed, both flanges will protrude through the
square opening and will be visible on the outer surface of the mounting rail. Repeat steps 1-3
until all required cage nuts are installed.
4
After installing the required cage nuts, use the included black mounting screws and cup washers
to secure your equipment to the rack rail. Place the cup washers between the screws and the
equipment mounting brackets.
Note: Your equipment may also include mounting hardware. Read the mounting instructions that came
with your equipment before installing your equipment.
To Remove Cage Nuts, Reverse Steps 1-3
Note: You may wish to use a cage nut tool (user-supplied) to aid cage nut installation and removal.
1 Rack Unit
7
29
28
27
26
25
2
24
24
23
22
22
21
3
20
2 2
2
19
1
3
19
18
2 2
18
2
2
3
1 9
2 2
2
1 8
3
3
1 9
2
1 8
4
1
1 8

Publicité

loading