Télécharger Imprimer la page

GUTMANN CARTA 7500 Notice De Montage page 34

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
All manuals and user guides at all-guides.com
EN
5. MOUNTING PREPARATION
Transport, unpacking, installation
Condensation may occur if the appliance is brought into the installation site from a
cold environment. Please wait until the appliance has adjusted to the temperature and
is completely dry before operating it. The acclimatization period depends on the tempe-
rature difference and the type and design of the appliance. However, it should be at
least 12 hours.
Please wear protective gloves during installation to avoid the risk of injury. Prepare the
necessary tools before mounting the hood.
For the installation of the hood, on-site requirements must be met to ensure smooth
installation
of
the
Prepare a suitable exhaust air duct in the ceiling, open the false ceiling, create ope-
nings, etc...
Before drilling in the wall, make sure that no pipes behind it are damaged.
34
hood
and
kitchen
appliances
must
be
covered.

Publicité

loading

Ce manuel est également adapté pour:

Carta 7510