If present, remove the tie down brackets from vehicle frame rail. Return bolts and tie down bracket to owner.
1.
Raise hitch into position and install fasteners as shown above.
2.
Tighten all fasteners with torque wrench to 68 Lb.-Ft. (92 N*M)
Tighten all M12 CL8.8 fasteners with torque wrench to 68 Lb.-Ft. (92 N*M)
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
Sommaire des Matières pour Cequent Performance Products 51171
Page 1
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5 and SAE J684. Sheet 1 of 3 51171N 8-25-09 Rev. A 2009 Cequent Performance Products Form F206 Rev A 5605...
Page 2
Ce produit est conforme aux normes V-5 et SAE J684 de la V.E.S.C. (État de New York) concernant les spécifications en matière de sécurité des systèmes d’attelage. Feuille 2 de 3 51171N 8-25-09 Rev. A 2009 Cequent Performance Products Form: F205 Rev A 5-6-05...
Page 3
Este producto cumple con las especificaciones y requisitos de seguridad para conectar dispositivos y sistemas de remolque del estado de Nueva York. V.E.S.C. Regulación V-5 y SAE J684 Hoja 3 de 3 51171N 8-25-09 Rev. A 2009 Cequent Performance Products Form: F205 Rev A 5-6-05...