C
B
8
1
2
Step.12
A
A. Unplug the Thermistor (CN44) from the control board and route
the harness from control box area out through the rubber grommet.
B. Remove the brackets which secure the coil assembly if not
already done.
B
C. Slide the coil assembly out of the air handler cabinet.
C
9
10
11
D
E
F
G
H
Step.13 Remove the Plate Guide Rear (3 screws) and Side Drain
Pan (4 screws) along with supporting brackets (4 screws) from the
coil assembly.
I
RRECT
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
J
5/8"
1
2
(15mm)
12
A
9
10
3
4
5
6
The parts are required to meet the latest RoHS directive.
12
13
14
PLATE GUIDE REAR
INCORRECT
3
4
5
6
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DIM.mm
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
A
B
C
11
D
DETAIL B
E
F
7
8
9
G
H
15
16
A
Step.14a Install the (2) drain pan seals included in the accessory
I
bag as shown above. These seals will cover the unused holes in the
side drain pan to prevent leaks.
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
B
SIDE
DRAIN
J
PAN
1
2
C
PLATE
GUIDE
REAR
D
E
F
Step.14b Reinstall the brackets to the opposite side of the Side
Drain Pan. The Side Drain Pan will be reinstalled on the opposite
G
side of the Coil Assembly. Reattach the Plate Guide Rear on the
opposite side of the coil assembly.
PLASTIC TIE
7
8
9
H
ITEM
MODEL NAME
PLASTIC TUBE
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
3D
CONFIDENTIAL
J
8
The parts are required to meet the latest RoHS directive.
12
13
10
11
12
PLASTIC TIE
PLASTIC TUBE
DETAIL B
DETAIL B
PIPING
3
4
5
DIM.mm
SCALE
0.200
NTS
10
11
12
14
15
13
14
15
CORRECT
5/8"
(15mm)
6
7
8
SIDE
DRAIN
PAN
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
CASTING
PRESS WORKING
A
GAS CUTTING
SHEARING
MACHINING
MEDIUMCOARSE
MITSUBISHI ELECTRIC CORPORATION
3D
CONFIDENTIAL
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
13
14
15
16
GRADE
FINE COARSE
B
C
D
E
A
B
A
B
8
16