The parts are required to meet the latest RoHS directive.
Step. 6 Remove the (4) screws indicated in the image along with the
brackets that secure the coil.
Step. 7 Slide the entire fan assembly out from the cabinet.
2
3
4
7
8
9
Step.8 Remove the electrical enclosure from the fan assembly.
10
11
1
2
5
6
7
A
B
C
D
E
F
G
H
I
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
J
1
2
5
6
7
10
11
12
13
B
C
3
4
5
8
9
10
The parts are required to meet the latest RoHS directive.
D
E
F
Step.9 Rotate the blower assembly 180°. The motor should now be
on the opposite side.
G
H
1
2
3
A
I
B
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
Step.10 Reinstall the enclosure for the return air temperature
C
sensor on the blower assembly on the opposite side from its original
J
location.
1
2
D
E
F
3
4
5
G
MOTOR
ON
LEFT
H
MITSUBISHI ELECTRIC CORPORATION
DATE
DIM.mm
8
9
10
SCALE
DRAWN
I
1:5
CHECKED
NTS
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
DESIGNED
Step.11 Reinsert the blower assembly with the motor now on the left
12
13
J
into the air handler cabinet and reuse the (2) screws that secured
1
2
3
the fan assembly in position. Reroute the (2) connectors for the
motor back into the enclosure and reconnect.
NOTE: The wiring harness might have to be removed from the
plastic retainers mounted to the motor bracket in order to have
sufficient length to reach the electrical enclosure mounted to the fan
assembly. Ensure wiring harness is secure so it cannot be pulled
into the fan. Reroute the return air thermistor connector back into the
electrical enclosure and reconnect.
14
15
6
7
8
9
11
12
13
4
5
6
7
The parts are required to meet the latest RoHS directive.
1:2
3
4
5
6
7
8
9
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
CASTING
PRESS WORKING
MITSUBISHI ELECTRIC CORPORATION
GAS CUTTING A
SHEARING
DATE
DIM.mm
MACHINING
MEDIUM COARSE
DRAWN
SCALE
3D
1:5
CHECKED
CONFIDENTIAL
NTS
DESIGNED
APPROVED
11
12
13
14
15
4
5
6
7
16
A
B
10
11
14
15
C
D
E
F
8
9
10
11
1:2
G
6
7
H
10
11
GRADE
P
1:
I
FINE COARSE
A
B
C
D
E
3D
B
A
B
APPROVED
14
15
J
6
16
8
9
10
11
11