Poulan Pro 52 Manuel Du Propriétaire page 8

Système de ramassage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONTAINER INSTALLATION
1. Install containers on support frame, overlapping
containers at center tube.
2. Close cover and lock latch handle over support
tubes.
NOTE: One container should always overlap the other
container at the center tube.
8
ASSEMBLY
CHUTES
1. Slide upper chute onto middle chute, lining up the
middle chute latch and the acorn nut on the upper
chute.
2. Stretch the bungee latch up onto the acorn nut.
3. Push the upper chute through the opening in the
bagger cover.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

96679300261966793003

Table des Matières