Télécharger Imprimer la page

fadini Hindi 880 evo Notice D'instructions page 16

Masquer les pouces Voir aussi pour Hindi 880 evo:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

HINDI 880 - evo
WIRING DIAGRAM AND ACCESSORIES
Before fitting Hindi 880-evo make sure the installation is pre-set for all the safety and control accessories as required.
General layout: it is the installer's responsibility to lay the connection pipes and tubes as properly and correctly required.
11
4x1 mm²
2x1 mm²
4
4x1 mm²
10
6
1 - Flasher
2 - Controller (installed in a protected and sheltered place)
with plug-in radio receiver
3 - 230 V - 50 Hz - 0,03 A magneto-thermal differential circuit breaker (not supplied with the equipment)
(2,5 mm² cable section beyond 100 m)
4 - Recess photocell receiver
5 - Hindi 880-evo
6 - Open position gate stop (compulsory, not supplied with the equipment)
7 - Electric lock: Hindi 880-evo non locking version and with gate leafs wider than 2,0 m
8 - Closed position gate stop (compulsory, not supplied with the equipment)
9 - Recess photocell transmitter
10 - Stud 0,5 m - code 153L
11 - Recess key-switch - code 143L
12 - Remote control
!
FIRST OPERATIONS TO RUN THE PISTON SHAFT
Before fixing the operator to the gate and gate post, power supply Hindi 880-evo and run the piston shaft fully out; then swap
the phases and run it 5-6 mm in.
!
IMPORTANT: then fully screw the ball bearing fixing eye into the shaft (Pic. 4).
universal oil-hydraulic operator for swing gates
9
5
IMPORTANT: gate stops in open and closed gate positions are absolutely
necessary for the proper functioning of Hindi 880-evo.
After running the piston shaft
!
fully out, swap the phases and
run it 5-6 mm in.
5-6 mm
Ball bearing
fixing eye fully
screwed in
7
8
9
10
16
1
RG58
2x1 mm²
4
4x1 mm²
5
6
2x1 mm²
The electric cable must dangle free of
any impediment during the opening
and closing movements of the gates.
!
2
230 V 50 Hz ±10%
3
4x1,5 mm²
12
Pic. 3
Pic. 4

Publicité

loading