Télécharger Imprimer la page

Panasonic KY-B84AX Instructions D'installation page 6

Masquer les pouces Voir aussi pour KY-B84AX:

Publicité

Les langues disponibles

Les langues disponibles

Post-installation Checklist
Upon completing installation, check and mark off the following items.
Appearance
Electrical
work
Electrical
testing
- Make sure to turn off each IH heater and the main power switch after performing
electrical testing.
- Hand the Operating Instructions, Installation Instructions, and Warranty Certificate to
the customer.
Panasonic Canada Inc.
5770 Ambler Drive, Mississauga, Ontario, L4W 2T3
www.panasonic.ca
© Panasonic Corporation 2011
10
Checklist
- Does the appliance not look like it is tilted to the front,
back, left or right?
- Is the frame not lifted up?
- Is the top plate clean?
- Is the power supply a single phase, 240 V?
- Has the ground been installed?
- Has the earth leakage circuit breaker been installed?
1. Touch
to turn on the main power.
- Does the main power light light up?
2. Touch the following keys to check function of each
IH heater:
- Left front heater
- Left rear heater
- Right front heater
- Right rear heater
I hereby certify that installation has been completed.
Does "7" (heat
level display)
flash?
Signature of installer
Checked
Printed in Japan

Publicité

loading

Ce manuel est également adapté pour:

Ky-b84ag