UNIVERSE MEDIUM & LARGE
INSTALLATION POLE MOUNT
WARNING: Fixtures must be grounded in accordance with local codes or the National Electrical Code. Failure to do so may result
!
in serious personal injury. SEE BACK PAGE FOR ADDITONAL SAFETY WARNINGS AND CAUTIONS.
Les appareils doivent être mis à la terre conformément aux codes locaux ou au Code national de
AVERTISSEMENT:
!
l'électricité. Ne pas le faire peut entraîner des blessures graves. Reportez-vous à la page précédente pour obtenir
des avertissements et des mises en garde supplémentaires.
MAINTENANCE INSTRUCTIONS:
INSTRUCTIONS D'ENTRETIEN:
1. For opening and closing of the fixture, refer to instructions and diagrams on instructions.
2. A regularly scheduled maintenance program should be established to retain optimum light output and
reduce heat retention. Dusting with a soft, clean, dry cloth is normally sufficient for the optics.
Do not use alkaline or acid cleaners on reflector surfaces.
NOTE: All wiring must be done by a qualified electrician.
KEEP THIS SHEET FOR FUTURE REFERENCE.
Make certain electricity is off before beginning maintenance procedures.
!
Assurez-vous que l'électricité est éteinte avant de commencer
!
les procédures d'entretien.
Tool Required:
STEPS:
5/32 Allen Wrench
1) Turn off power to the unit and take proper safety precautions.
1/8 Allen Wrench
2) Remove (3) button head cap screws & (3) internal tooth lock washers from the
fixture assembly & put them aside.
3) Make wire connections from arm assembly to fixture assembly with (6) quick
disconnects. Push wires and (6) quick disconnects into the top dome.
4) Secure fixture assembly onto arm assembly by (3) button head cap screws
with (3) internal tooth lock washers. NOTE: When assembling fixture assembly to
arm assembly make sure the locator hole must be on the street side as shown on
the detail drawing.
5) Make wire connections from incoming supply to arm/fixture assembly and
slip it over the pole.
6) Rotate arm/fixture assembly to desired orientation. Securely tighten (6) s/s set screws.
7) Turn on power and check for operation.
8) INSTALLATION COMPLETE.