Assembly Procedure; Parts Check List - Napoleon PTH55NSS-1 Manuel D'installation Et D'opération

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TOOLS NEEDED (NOT SUPPLIED)
10mm Open Ended Wrench
13mm Open Ended Wrench
2 x 8 "Adjustable Wrenches
Slip joint pliers 9 inches long
Philips Screwdriver Medium Blades
eflon Plumbing Tape for Joints
Spray Bottle Filled with Soapy Water to Check for Leaks

PARTS CHECK LIST:

ATTENTION:
IT'S STRONGLY RECOMMENDED TO SECURE THE BASE BY SCREWING BOLTS
ON ANY GROUND SURFACE THE HEATER STANDS.
STEP 1:
1.1 Using screws(L), place L-shaped stabilizers
(I) to bottom base(B).

ASSEMBLY PROCEDURE

15
STEP 2:
2-1 Place base post (G) on
the bottom base(B) upward.
2-2 Secure using screws(L).

Publicité

Table des Matières
loading

Table des Matières