IN-GROUND
POWER LIFT
BASKETBALL SYSTEM
MODEL #60091
MODEL 71525
BEFORE ASSEMBLY:
• Requires at least 493 lb (224 kg) of cement mix to fi ll a volume of
3.7 ft
3
(0.105 m
3
).
• Requires at least 3 days for concrete to cure, plus 3–4 hours to
complete assembly steps.
• At least 3 people recommended for setup.
GET ASSEMBLY HELP
ASSEMBLE IT WITH THE FREE BILT INTELLIGENT
INSTRUCTIONS APP
IN THE APP, SCAN OR SEARCH #1197946
SAVE THIS INSTRUCTION IN THE EVENT THAT THE MANUFACTURER
HAS TO BE CONTACTED FOR REPLACEMENT PARTS.
TOOLS REQUIRED
3/4" (19mm), 1/2" (13mm),
9/16" (14mm), 7/16" (11mm)
(x2)
(x1)
Rebar
(3')
QUESTIONS?
CONTACT LIFETIME CUSTOMER SERVICE:
Call: 1-800-225-3865
7:00 am–5:00 pm (Monday–Friday) MST
and 9:00 am–1:00 pm Saturday MST
™
(x1)
Cement Mix
493 lb (224kg)
(x1)
Live Chat:
www.lifetime.com
ASSEMBLY INSTRUCTIONS
Pour le français, voir la page 2. Para el español, ver la página 3.
(x1)
(x1)
(x1)
(x1)
(x1)
(x1)
For Customer Service in Mainland
Europe and the United Kingdom,
E-mail: cs@lifetimeproducts.eu
TABLE OF CONTENTS
Icon Legend................................4
Notices....................................5
Initial Set Up..............................6
Pole Assembly..........................12
Backboard to Rim Assembly.......16
Backboard to Pole Assembly.......22
Parts Identifi er..........................i - iv
Handle Assembly.......................26
Final Assembly..........................32
Maintenance Instructions..........38
Warning Sticker........................39
Registration........................40
Warranty................................41
(x1)
Model Number: 71525
Product ID: