AMQ Activ Guide D'assemblage page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Phase 6 | Worksurface Mounting
Step 1
To attach the worksurface, start by laying the
worksurface down on the floor with the top
down.
Step 2
Lay the base assembly upside down on top of
the worksurface.
T - Type Cantilever
ST 5*20 x 18
for worksurface
Activ-Pro Assembly Guide | 11
C - Type Cantilever
ST 5*20 x 16
for worksurface
Step 3
Double check to ensure that the base is properly
positioned on the underside of the worksurface,
and then attach with wood screws.
Note: The worksurface should be center aligned
with the cantiliver depth and should have equal
amount of overhang on each end. Wireless drill is
required for assembly.
Handset
ST 5*18 x 2
amqsolutions.com

Publicité

Table des Matières
loading

Produits Connexes pour AMQ Activ

Ce manuel est également adapté pour:

Activ-pro

Table des Matières