Shelter Assembly (Continued)
SNAP BUTTON
LOCATION
A
TO INSTALL U-FRAMES (ITEM Z) SLIDE U-FRAME TUBE OVER FRAME POLE TILL
TO INSTALL U-FRAMES (ITEM Z) SLIDE U-FRAME TUBE OVER FRAME POLE TILL
SNAP BUTTON IS ENGAGED IN SECOND HOLE FROM THE END
SNAP BUTTON IS ENGAGED IN SECOND HOLE FROM THE END
8
Frabill Instruction Manual• Manuel d'instructions 1-800-558-1005 • email: service@frabill.com • www.frabill.com