Télécharger Imprimer la page

Grohe F-digital Mode D'emploi page 8

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
GB
Safety notes
Prevent danger resulting from damaged power
supply cables. If damaged, the power supply cable
must be replaced by the manufacturer or his
customer service department or an equally qualified
person.
• Installation is only possible in frost-free rooms.
• The optional power supply unit is only suitable for indoor use.
• The plug-in connectors must not be directly or indirectly
sprayed with water when cleaning.
• The voltage supply must be separately switchable.
• The maximum permissible distance between the digital
controller/diverter of the functional unit and the transceiver
is 5 m.
Application
Thermostatic mixers are designed for hot water supplies from
pressurised storage heaters and offer the highest temperature
accuracy when used in this way. With sufficient power output
(from 18 kW or 250 kcal/min), electric or gas instantaneous
heaters are also suitable.
Thermostats cannot be used in connection with unpressurised
storage heaters.
All thermostats are adjusted in the factory at a flow pressure
of 0.3 MPa on both sides.
Technical data
• Flow pressure
- Minimum flow pressure without downstream
resistances:
- Minimum flow pressure
with downstream resistances:
- Recommended
• Operating pressure
• Test pressure
If static pressure exceeds 0.5 MPa a pressure-reducing
valve must be fitted.
Avoid major pressure differences between hot and
cold water supply.
• Flow rate at 0.3 MPa flow pressure
(with simultaneous use of all outlets):
• Minimum flow rate:
• Hot water supply temperature:
• Recommended (energy saving):
• Hot water temperature at supply connection min. 2 °C higher
than mixed water temperature.
• Voltage supply:
• Power consumption:
• Radio frequency:
• Transmitter power:
• Digital controller battery:
3x 3 V lithium batteries (type CR 2450)
• Automatic safety shut-off (factory setting):
• Safety stop (factory setting):
• Type of protection: - Functional unit
- Digital controller/diverter
- Transceiver
• Water connection:
Electrical test data
• Software class:
• Contamination class:
• Rated surge voltage:
• Temperature for ball impact test:
5
The test for electromagnetic compatibility (interference
emission test) was performed at the rated voltage and rated
current.
Approval and conformity
The conformity declarations can be obtained from the following
address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
Electrical installation
Rough installation
During installation, please note:
• The functional unit must be accessible for maintenance
work.
• The functional unit must not be installed with the lid facing
downwards.
• A vacant tube must be used to connect the functional unit to
the power supply unit and to the transceiver.
• The plug-in connectors and the transceiver must be
0.1 MPa
accessible.
0.2 MPa
Prepare the wall for the installation, refer to the dimensional
0.2 – 0.5 MPa
drawing on fold-out page I and Figs. [1] and [2] on fold-out
max. 1.0 MPa
page II.
1.6 MPa
Install functional unit, see fold-out page II, Figs. [1] to [6].
Observe printing on the lid, see Fig. [3].
1. Prepare holes for the functional unit as well as slots for
the pipes and vacant tubes, see fold-out page II, Figs. [1]
and [2].
2. Unscrew screw (H) and remove lid, see Fig. [3].
approx. 50 l/min
3. Align and fasten functional unit in place, see Fig. [4].
5 l/min
4. The cold water supply must be connected to the inlet
min. 50 °C - max. 80 °C
marked COLD, the hot water to the inlet marked HOT,
60 °C
see Fig [5].
GROHE recommends installing isolating valves upstream
of the functional unit to facilitate servicing.
230 V AC, 50/60 Hz
Do not solder the connections.
9 VA
5. Route the mixed water outlet to the points of discharge; it is
2.4332 GHz
essential that outlet 1 be connected.
< 1 mW
6. Seal plug (A) in the unused outlet, see Fig. [5].
Route connection cable in vacant tube, see Fig. [6].
Max. two extension cables can be combined (max. 6 m),
20 min
see Replacement parts, fold-out page I.
38 °C
7. Attach the plug-in connector (B) to the power supply unit and
IP 40
to the functional unit.
IP 57
Do not connect voltage supply yet.
IP 68
8. Install transceiver (C) in the inspection chamber or on the
COLD/HOT
wall and attach the plug-in connector.
Flush the functional unit, see fold-out page II, Figs. [7] and [8].
1. Remove screw plug (D), see fold-out page II, Fig. [7].
B
2. Remove the non-return valve (E) and the filter (F).
2
2,500 V
100 °C
This product conforms to the requirements of the
relevant EU directives.
Electrical installation work must only be performed
by a qualified electrician. This work must be
carried out in accordance with the regulations
to IEC 364-7-701-1984 (corresponding to
VDE 0100 Part 701) as well as all national and
local regulations.

Publicité

loading