Wall Track Installation - OVE SYDNEY 667449 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Ensure the base and walls are leveled. Place the metal track (B) approximately 20mm (3/4in) from the edge
of the base to the center of the metal track. Ensure the metal track (B) is leveled, then mark the holes clearly
on the wall using a pencil.
2. Remove track and drill pilot holes in the marked locations. Using Φ8mm (5/16in) ceramic drill bit.
3. Insert the wall anchors (EE) using a rubber mallet until the wall anchors are flush with the wall.
4. Replace and secure the metal track (B) with screws (CC). Do not overtighten.
Note: Insert the door panel's bottom seal strip (L) at the base of door
panel (C) and cut the surplus with a cutter. Place the door panel (C)
inside the shower enclosure to facilitate future steps.
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!

WALL TRACK INSTALLATION

9
1
B
2
Φ 8mm
5/16in
3
EE
4
B
CC

Publicité

Table des Matières
loading

Table des Matières