VBM DOMOBAR JUNIOR 2B Manuel D'instructions page 60

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2
22
7.5,
HOT W ATER SUPPLY.
· Check that the pressure inside the steam boiler is 1.2 bar
4
3
(0.12 MPa) indicated on the pressure gauge (2).
· Remove the lance (3) from the machine.
ATTENTION: The lance (3) is very hot.
Move the lance only with proper rubber
protection; Danger of scalding.
· Place a cup under the lance (3).
· Open the tap slowly turning the knob (4) counterclockwise.
· Once you reach the desired amount, close the tap (4).

Publicité

Table des Matières
loading

Table des Matières