Final Operations; Levelling The Cooker To The Floor - steel E9F5FINF Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4. Final operations

4.1
After having made the electrical and gas hook-ups, level the cooker to the
floor using the adjustable feet that were previously screwed onto the bottom
of the cooker.
Should it be necessary to drag the cooker, screw the feet in completely and carry out the final
regulation only when the other operations are completed.
Check all connections for gas leaks with soap and water. DO NOT use a naked flame for detecting
leaks. Ignite all burners to ensure correct operation of gas valves, burners and ignition. Turn gas
taps to low flame position and observe stability of the flame. When satisfied with the hotplate,
please instruct the user on the correct method of operation. In case the appliance fails to operate
correctly after all checks have been carried out, refer to the authorised service provider in your
area.
80
Instructions for the installer

Levelling the cooker to the floor

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

AdagioDerbyPartyOxfordEnfasi

Table des Matières