Masquer les pouces Voir aussi pour ABK4200:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Hold the crossbar between the posts to align the two mounting holes on both ends of the crossbar with the two
lower mounting holes of each post. Pre-install four hexagon head bolts on both sides and finger-tighten the bolts
and nuts (Fig. 12).
5. Securely tighten all four bolts on both sides by an impact wrench with a 1/2'' (13mm) socket (not included) (Fig. 13).
12

Crossbar

Hexagon head bolts
13
Impact Wrench
GRASS BAGGER KIT — ABK4200
9

Publicité

Table des Matières
loading

Table des Matières