CDVI BO600RP Manuel D'installation page 4

Bandeau architectural vertical
Masquer les pouces Voir aussi pour BO600RP:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION MANUAL
BO600RP
Vertical retrofit housing
4] ASSEMBLY
1
Position the box-section backplate,
complete with pre-fitted electro-
magnetic locks, on to the door
frame
(or
fixed
door
installing onto double doors)
ensure the positioning will allow
for the architectural handle to
close securely over the section.
Once you are satisfied with the
position, mark the vertical and
horizontal holes, then drill as
required. Take note of the cable
entry holes, and feed the cables
through. Fix the section into place,
then wire the electromagnetic
locks in accordance with the
wiring schematic in Section 5.
Fit the box section cover into
place, fit the end caps and secure
with the M4 screws provided. To
finalise the assembly, tighten all
fixings, and protect the handle
fixing section by fitting the cover
and end caps.
cdvi.com
4
cdvigroup.com
2
With the door closed, position the
architectural handle onto the edge
of the opening leaf of the door,
leaf
if
ensuring the handle covers the
-
box-section. Mark the vertical and
horizontal holes, drill as required,
then temporarily fix the handle
leaving a small gap around the
box section – check the alignment
of the magnets in the box section
with the armatures in the handle.
Adjust if necessary, then once
satisfied, secure the handle by
completing the fixings.
3
Cut the top cover unit into 2
pieces. Double check the length of
each section of top cover before
final cutting. Take into account
the
plastic
handle
Ensure the plastic handle is at
optimum position for users, then
make the final cuts to the covers.
Insert the end caps and secure.
Insert the plastic handle and clip
it into position. Secure the handle
with the 2 screws.
EN
(215MM).

Publicité

Table des Matières
loading

Table des Matières