MaxLite WallMax WPC Serie Mode D'emploi page 5

Luminaire grand à éclairage dirigé
Masquer les pouces Voir aussi pour WallMax WPC Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operating Instructions
MaxLite WallMax™ Cutoff
®
Installation & Operation - Junction Box Mounting: (Continued)
13. Reinstall the heatsink and
reconnect the terminals
between the CCT Switch
and the LEDs.
Installation & Operation - Conduit Mounting:
1. Turn off the power before
beginning installation.
ON
OFF
4. Drill through the three (3)
corner mounting holes on
the back plate.
7. Using three (3) anchor
bolts (not included),
secure the back plate to
the wall.
© Copyright 2021. MaxLite, Inc. All Rights Reserved.
12 York Ave, West Caldwell, NJ 07006 Tel: 800-555-5629 Fax: 973-244-7333 Email: info@maxlite.com
14. Close the fixture and secure it with
the two (2) screws loosened in
step 2.
2. Use a Phillips-head screwdriver to
loosen the two (2) screws on the right
side of the fixture.
5. Drill three (3) holes in the wall that
match the locations of the holes
drilled in step 4 when mounted.
8. Use a Flat-head screwdriver to
remove one of the side ½" KO plugs
that will be used to feed the supply
conductors into the fixture.
15. Make sure the installation is
complete before turning the
power back on.
ON
OFF
3. Open the fixture and disconnect the
connection terminals between the
LED driver and LEDs. Remove the
heatsink from the back plate.
6. Attach the included EVA foam
gasket onto the back plate.
9. Pull the supply conductors through
the side KO hole. Connect the Line,
Neutral and Ground wires from the
driver to the supply conductors.
WPC Series
Page: 5
REV: 10/29/21

Publicité

Table des Matières
loading

Table des Matières