Operation; Cleaning And Maintenance; Cleaning The Heating Element; Replacing The Fuse - EuroLite N-19 Mode D'emploi

Masquer les pouces Voir aussi pour N-19:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

Switch the device on via the power switch.
CAUTION: The escape nozzle will heat up during operation. Therefore do not touch the nozzle until it
has cooled down completely.

CLEANING AND MAINTENANCE

We recommend a frequent cleaning of the device. Please use a soft lint-free and moistened cloth. Never use
alcohol or solvents!
Clean the escape nozzle frequently from fog fluid residues. Clean out debris with vinegar and a pipe cleaner,
making sure that the hole is free of clogs.

Cleaning the heating element

The heating element should regularly be cleaned every 30 operational hours in order to avoid clogging. Use
fog machine cleaner available at your dealer.
Procedure:
Fill cleaner into empty tank. Run the machine several times in a well-ventilated room only. The number of
repetitions depends on the pollution level of the vaporizing elements. After use clean all remaining cleaner
and rinse the tank thoroughly with distilled water.
The EUROLITE fog fluids we recommend are non-hazardous to the environment and can be disposed of via
the sewage system.
There are no serviceable parts inside the device except for the fuse. Maintenance and service operations are
only to be carried out by authorized dealers.

Replacing the fuse

If the fine-wire fuse of the device fuses, only replace the fuse by a fuse of same type and rating.
Before replacing the fuse, unplug mains lead.
Procedure:
Step 1: Unscrew the fuseholder on the rearpanel with a fitting screwdriver from the housing (anti-
clockwise).
Step 2: Remove the old fuse from the fuseholder.
Step 3: Install the new fuse in the fuseholder.
Step 4: Replace the fuseholder in the housing and fix it.
After a certain warm-up time, the device is ready to operate. Then the stand-by
lamp of the remote control lights up. By operating the fog switch on the remote
control the fog emission starts. It may happen that the stand-by lamp turns off
and the fog emission stops. In this case the device is heating up again and will
be ready to operate in approx. 1-2 min. This process guarantees an
appropriate vaporization temperature and the best fog emission possible. The
temperature is regulated by a high quality thermostat.
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
18/28
00099595, Version 4.2

Publicité

Table des Matières
loading

Table des Matières