GB
7. Maintenance and inspection
7.1 Safety measures
i
Important!
The operator must provide any protective
clothing that may be required.
Who can carry out maintenance
and inspection work?
» Normal maintenance work may be
carried out by trained operating personnel.
7.2 Maintenance and inspection table
Interval
Assembly
As
Outside of filling
required
station
Container
Monthly
Piping system
Moving parts of
the tank
Annually
Leak detector
Every 2.5
Filling station
years
7.3 Explanations on recurrent checks
and inspections
The DT-Mobile Easy must also be inspected in
accordance with ADR 6.5.4.4.1 b) at intervals of at
most two and a half years . This inspection must
check the external condition and correct operation
of the operating equipment and must satisfy the
responsible authority.
36
Action
Clean off any stuck-on dirt or diesel.
Repair damage to the galvanisation through cold galvanisation or damage
to the paintwork with 2K PU paint RAL 7036 "platinum grey".
Visual check for damage
Check hoses for cracks and porosity, check fittings for leaks
(replace defective parts)
Lubricate hinges and closure with a few drops of universal oil.
Perform visual inspection and performance test as described in the operating
instructions for leak detector LS-03.
Inspection according to ADR 6.5.4.4.1 b) and 6.5.4.4.2
- Documentation in the test report (see section 10)
- For successful inspection – Make entry on type plate with waterproof pen –
Imprint on type plate (month/year)
i
Important!
Inspections of the filling station with
regard to the ADR approval may only be
performed by a recognised, registered
inspection agency.