Core Post Top PT50
Installation Instructions
WARNINGS
•
Before starting ensure that the power is disconnected.
•
This fixture is intended to be mounted on a heavy-duty
pipe or tenon 2 3/8" – 3" outer diameter.
•
All gaskets and screws used on luminaire must be in place.
PREPARE ELECTRICAL WIRING
Electrical Requirements
• The LED driver must be supplied at 120~347V, 50/60 Hz and
connected to an individual, properly grounded branch circuit
protected by a 20-ampere circuit breaker. Use min 75
Grounding Instructions
• The grounding and bonding of the overall system shall be done in
accordance with NEC Article 600 and local codes.
• When servicing maintain the ground connection between the
luminaire and lid.
1
Pass wires into post top tenon or pipe.
Make wire connections as seen in Figure
1. Place splices and excess wire in tenon
shaft.
Figure 1
11/18/2019
page 1
www.stonco.com
o
C supply.
2
Position fixture on post top tenon or pipe as
seen in Figure 2 below. Be sure not to pinch
wires between the top of the tenon and the
luminaire. Tighten down all eight ¼-20 x ¾"
hex screws provided to 72in-lbs (6ft-lbs).
Figure 2
Wiring compartment with
removable plate
8X ¼-20 x ¾"
hex screw
Pole Top Tenon
2 3/8" O.D. to 3" O.D. x 3" high
www.keene-lighting.com
Site & Area Post Top
LED Post Top
PT50 Core Post Top
Tools Required:
Hardware Supplied
M2.5 Allen Key
¼-20 x ¾" hex screw (8x)
Wire Strippers
#8-32 X 3/8" phillips screw (4x)
Wire Cutters
Phillips Screwdriver
Flathead Screwdriver
3
Restore power at circuit break and switch
on power.
Figure 3
PN 442295136631 Rev C