UNPACKING INSTRUCTION

CAUTION! Immediately upon receiving the product, carefully unpack the carton, check the contents to ensure that all parts are present, and
have been received in good condition. Notify the shipper immediately and retain packing material for inspection if any parts appear damage
from shipping or the package itself shows signs of mishandling. Save the package and all packing materials. In the event that the product must be
returned to the factory, it is important that the product be returned in the original factory box and packing.
If the unit has been exposed to drastic temperature fluctuation (e.g. after transportation), do not switch it on immediately. The arising condensation
water might damage your unit. Leave the unit switched off until it has reached room temperature.

POWERSUPPLY

On the label on the backside of the unit is indicated on this type of power supply must be connected. Check that the mains voltage corresponds to this,
all other voltages than specified, the light effect can be irreparably damaged. The product must also be directly connected to the mains and may be
used. No dimmer or adjustable power supply.
WARNING! Always connect the unit to a protected circuit (circuit breaker or fuse). Make sure the unit has an appropriate electrical ground to
avoid the risk of electrocution or fire.

GENERAL SAFETY INFORMATION BEFORE OPERATION

The foam can cause a higher risk of accidents, the following instructions must be observed to ensure safe operation:
Danger of suffocation for people or animals lying under the foam.
Maintain sufficient sight in all directions for operator and safety personnel.
There must be no obstacles in the foam area.
The floor surface must be non-slip.
Foam outside the intended area should be removed immediately with a rubber wiper
Foam generator, pump and tank should be always be attended by an operator,
When operating the device, a sufficient number of safety personnel has to be present for supervising the foam area so that any
„disappearing" person will immediately be noticed. If in doubt, the safety personnel have to limit the number of persons in the foam.
After switching off the foam machine, the safety personnel must remain in the foam area, until the foam has completely disintegrated and it
has been verified by safety personnel that the floor surface is dry and not slippery.

INSTALLATION

Pump and tank should be installed on a location not accessible for the audience and also has to be sufficiently blocked from the audience.
Notes:
-
Pump may not be placed in the foaming area.
-
Additionally the heavy weight of the tank after filling should be taken in account.
-
All cables and hoses must be routed in a way, that persons can not stumble or even rip them off. Also the cables must not get in contact with
the foam.

OPERATING

Before operating the unit in public a test foaming must be performed. Check all safety regulations! Correct fitting an tightness must be checked on all
cables and hoses.
Operate the device only after having familiarized with its functions. Do not permit operation by persons not qualified for operating the device. Most
damages are the result of unprofessional operation!
Step 1: Place the unit on the desires location.
CAUTION! Ensure a minimum distance between foam machine and audience of 2meter (6.5ft). Never direct the foam output nozzle to the
face or the eyes of people.
Step 2: Connect the hose to the foam tank and the pump.
Step 3: Connect the hose to the pump and the generator.
Step 4: Fill the foam tank with water (approx. 10 cm / 11 inch below opening)
Step 5: Add the foam concentrate fluid in the foam tank. Pay attention to the correct proportions!
Step 6: Stir the tank contents to homogenize the concentration
Step 7: Fill the pump with foam fluid. Open the valve to avoid the pump running dry
Step 8: Plug the pump and foam generator into an electrical outlet.
Step 9: Open de ball valve on the pump and turn it on. The foam output can be controlled by the position of the valve. Normally a 45° position should
be enough.
Step 10: Run both units, until the desires foam level is reached.
Step 11: When the level is reached, the pump must be switched off and the ball valve has to be closed. After approx. 30 seconds the fan can be
switched off.
Step 12: The foam canon may be restarted at any time, but you will always have to check the tank for a correct fluid level.
CAUTION! Dry running of the pump can cause irreparable damage to the pump.