Télécharger Imprimer la page

MaxLite HL3 Serie Mode D'emploi page 4

Publicité

Les langues disponibles

Les langues disponibles

Operating Instructions
MaxLite HL Linear High Bay Generation 3
®
Installation & Operation
D: Stem/Pipe Mounting Installation: HL3-PMKIT (mounting kit available separately)
Included with the mounting kit
HL3-PMKIT1
A
B
Mounting bracket - 2pcs
C Triangle lock screws - 6pcs
Mounting bracket cover - 2pcs
D
-
1. Align the pipe mounting bracket on the fixture back plate as shown in the Figure D-1.
2. Connect the line, neutral and ground wires and run them through the bracket hole. (Figure D-2). A flexible metallic conduit
may need to be used for 1.5ft models (Figure D-2).
3. Screw the hexagonal head screws into the rivet nuts to fix the pipe mounting bracket in place.
4. Cover the pipe mount bracket from all the sides using the bracket cover as shown. (Figure D-2).
2ft & 4ft Models
2ft & 4ft Models
© Copyright 2022. MaxLite, Inc. All Rights Reserved.
12 York Ave, West Caldwell, NJ 07006 Tel: 800-555-5629 Fax: 973-244-7333 Email: info@maxlite.com
HL3-PMKIT2
Mounting bracket - 2pcs
Mounting bracket cover - 2pcs
Triangle lock screws - 2pcs
Hex Cap Screws with washers - 4pcs
Fig. D-1
1.5ft Models
Fig. D-2
1.5ft Models
HL3 Series
Page: 4
REV: 11/02/22

Publicité

loading