Télécharger Imprimer la page

MALONE Maui-2 Instructions D'installation page 4

Publicité

Installation & Loading Instructions - MPG119 Maui-2
4
4
. Repeat instructions 1-4 for the remaining three
saddle assemblies so that all four are loosely
mounted on the front and rear cross bars.
See image 5.
6
6
. The SUP should now be evenly positioned in the
saddles and centered in the middle of the roof.
The saddles should be firmly secured to the
cross bar. See image 7.
MALONE
Insert mounting bolt through the opposite side
. Insert mounting bolt through the opposite side
hex hole and Jawz adapter. Loosely apply the
hex hole and Jawz adapter. Loosely apply the
second T-knob. See image 4.
second T-knob. See image 4.
5
5
. Gently place the first SUP onto the vehicle roof.
One at a time, reposition and tighten each saddle
so that the SUP is centered on the roof, and, the
sides of the SUP are fully captured and supported
by the saddles. See image 6.
7
7
R
TM

Publicité

loading

Ce manuel est également adapté pour:

Mpg119