Plumbing Modular Colorfalls
Connect the Colorfalls together using the 1½" threaded connector (included).
Begin by installing one end of the connector into the side inlet of one Colorfalls.
Align the second Colorfalls and spin it onto the threaded fitting (screwing the two
units together). Before they are completely tightened, install the double sided
gasket (included) at the end of the end of the spillway between the units. This
will create a watertight seal where the spillways meet. Pull the spillways of the
Colorfalls apart while completing the final turn of the Colorfalls body. Once you
have ensured proper alignment, press the spillways of the two units together
(sandwiching the gasket) to ensure it is in contact with both units.
Figure 2
When plumbing multiple Color Changing Colorfalls together, use the back center
inlet on each individual Colorfalls, plugging the side inlets, regardless if you are using
one pump or multiple pumps. This will balance the flow of water going to the falls.
Note: If plumbing two different sized Colorfalls together, a ball valve must be added
on each vertical feed line to adjust the water flow into each unit.
The individual feed
lines to each Colorfalls
should be 1½" PVC. If
using one pump to feed
multiple Colorfalls, the
main feed line should
be 2" or larger. The
main feed line should
be run horizontally
along the back of the
wall with vertical 1½"
feed lines branching
off to each Colorfalls
(Figure 3).
Operation
Technical Data (Control Module)
Working Temperature:
0ºF -140ºF (-20°C - 60ºC)
Output: 3 circuits (R/G/B)
4
1½" connector fitting
1½"
Figure 3
Input Power: AC12V
Output Power: DC12V, 80 watts max
Output Current: 2A /circuit
1½"
2" Feed
Lines