Parker Zander GL Série Notice D'utilisation page 22

Table des Matières

Publicité

EN | Operating Instructions
Maintenance
Hazard due to a sudden release
of pressure!
On completion of all maintenance
work, make sure that the filter hous-
ing is fully closed.
A burst filter can cause serious
injuries!
Always heed the prescribed service inter-
vals. Proper operation of the filter cannot be
warranted in case of non-compliance.
Weekly
Check the float drain for tightness and
proper functioning once a week.
A permanent flow noise must not be heard.
Otherwise you must replace the float drain.
Yearly
Element types VL, XL, ZL must be replaced
once a year.
Check the float drain for contamination dur-
ing this procedure and clean it if necessary.
If required
The maximum exchange interval of activated
charcoal element A is 650 operating hours.
The following factors can require a prema-
ture exchange:
high temperatures,
high oil mist concentration,
high relative humidity.
This means you must perform regular
measurements to determine the optimum
exchange interval.
22
Compressed air filter series GL
Replacing the filter element
Hazard due to a sudden release
of pressure!
Depressurise the filter before carrying
out any work on the filter! A sudden
escape of pressure may cause seri-
ous injuries.
- Block compressed air supply to the filter.
- Depressurise the filter. To do so, you may
have to open the condensate drain at the
filter bottom.
- Give the lower housing a full turn in clock-
wise direction and take it off downwards
(Figure 5).
- Take out the filter element and dispose of
it according to the operating instructions.
- Replace seal (Figure 6).
- Insert the new filter element: The lugs fit
the recesses in the lower housing exactly
and ensure the correct seat of the filter
element (Figure 7).
- Apply a thin coat of grease on the thread
of the lower housing.
- Using the marks, vertically align the lower
section with the upper section of the
housing and fully close off with one com-
plete turn (Fig. 8).
- If necessary, close the condensate drain
and open the pipe to the filter.
- Check the filter for tightness.
GL2-19_Int1_04

Publicité

Table des Matières
loading

Table des Matières