Da compilare e conservare per futuri riferimenti. ‐ To be completed and kept for future references. ‐ Para ser
completado y conservado para referencias futuras. ‐ A compléter et conserver pour de futures références. ‐ Fuellen
Sie aus und bewahren fuer zukuenftige Referenzen. ‐ Необходимо заполнить и сохранить для будущих нужд.
INSTALLATION
Duty point:
Flow:
Date of installation:
Incoming voltage:
Running Amps:
Max. temperature of the pumped liquid:
Notes:
SUBMERSIBLE PUMP INSTALLATION FORM
Well/casing diameter
Pipe diameter
Pipe material
Nr. of Sticks of pipe
Static water level
Dynamic water level
Spring assist check valves
(number, meters and types)
Pump inlet setting
Flow sleeve diameter
(if present)
Case ends
Well depth
1 Electric submersible pump
3 Level probes
5 Pipe
7 Control box
9 Manometer
A Static level
Head:
Operation time:
V
Motor insulation resistance
A
m type
1
m type
2
m type
3
from
m to
1
from
m to
2
2
Cable holder clamps
4
Check valve
6
Cable
8
Priming air valve
10 Gate valve
B Dynamic level
Hours
Mohm
°C
mm
mm
m
m
m
mm
m
m
m
5