Table des Matières

Publicité

EN

TECHNICAL DATA

Minimum dynamic pressure:_________________________________________________________0.5 bar
Maximum operational pressure:________________________________________________________5 bar
Recommended operational pressure:_________________________________________________1-5 bar
It's recommended to use a pressure reducer in case of
static pressure superior than 5 bar inside the waterpipe.
Maximum hot water temperature:_______________________________________________________80°C
INSTALLATION, MAINTENANCE AND PRELIMINARY CHECKING PROCEDURE
In order to get your device work correctly and fine in time, must ensure compliance with the
mode of installation and maintenance described in this booklet. Relying on a qualified plumber.
Make sure that the system is free from all debris and impurities existing.
INSTALLATION
Fig. 1-3: Arrange the pipes of the water supply with water attacks G1/2'' female. We suggest an
higher of 1100mm-43,3 in from the floor. The wheelbase of the pipes must be of 150 mm-5,9in.
the pipes have to stay integrated in the wall, considering the wall finished with his coating.
Make sure that the pipes are perfectly horizontal using a bubble level.
Fig. 2: Connect the attacks to the pipes of the water network, using hemp or PTFE to ensure
tightness on the threads.
Fig. 4: Positioning the template against the wall, using the G3/4'' attacks.
Fig. 5: In correspondence with the holes on the template, drill the wall with a. ø8-0.31 drill bit
for a length of 40mm.
Fig. 6-7: Remove the template, insert the rawplugs into the wall hoses, and lock the insert by
tightening the screws.
Fig. 8: Screw the rosettes in the wall inlets inserting the gaskets. Tighten the nuts by inserting
the gasket into the nut. Positioned the thermostatic unit, screw the three grubscrew in the in
the rear part of the thermostatic unit.
After connecting the body to the system, turn on the stopcocks and check that the mixer tap
unit operates correctly. Keep the tap pressurised for a few minutes checking eventual leaks.
Fig. 9: Screw the ringnut of the connecting pipe to the inverter, inserting the flat gasket.
Fig. 10: Insert the support of the shower wall insert, blocking it with the grubscrew.
Fig. 11: Screw the ringnut of the head shower pipe to the diverter by inserting the flat gasket.
Fig. 12: connect the headshower inserting the plan gasket. Connect the diverter to the shower
support.
After having installed all the parts, check eventual leaks on the shower arm.
CLEANING
In order to obtain a correct cleanliness, exclusively wash them with soap and water, rewash and
dry them with a soft towel and deerskin. Avoid the usage of alcohol, solvents, solid or liquid
detergents which contain corrosive or acidic substances, abrasive sponges, swab with metallic
strings because they could irreversibly compromise the surfaces.
THE USAGE OF THIS KIND OF DETERGNETS DURING THE CLEANING OF THE MIXER EXCLUDE
IB RUBINETTERIE FROM ANY WARRANTY OBLIGATION.
All manuals and user guides at all-guides.com

Publicité

Table des Matières
loading

Table des Matières