GE RAK348T1 Instructions D'installation page 14

Masquer les pouces Voir aussi pour RAK348T1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS
INSTALL THE RECEIVER
7500 SERIES VERTICAL ZONELINE MODELS
4. Clean the mounting location.
Install the four mounting
post feet into each corner
hole on the underside of
the receiver. Peel off
the adhesive
backing from each
foot. Locate and
mount the receiver
onto the case top
by pressing it into position.
(If accidentally placed in
the wrong location or if the
receiver needs to be moved,
carefully pry each foot from
the unit, apply two-sided
tape to the feet and
relocate to the new
location.)
5. Turn on power at the main service panel by replacing the fuse or
switching the appropriate circuit breaker to the ON position.
6. Link the Thermostat to the receiver. See the "Link the Receiver"
section on pages 15 and 16.
IMPORTANT: This step must be performed correctly. Check the
thermostat to make sure it is accurately transponding to the receiver.
If the links were not set correctly, reset them. See the "Reset the
Thermostat" section in the Owner's Manual.
7. Put the cover back on the thermostat and secure with its cover
screw.
8. Replace the case front panel by replacing the four front screws and
the two top screws.
Recommended
mounting location –
Mount the receiver
to the case top
NOTE: If replacement mounting feet
are needed, they may be ordered at
www.mouser.com. Order part no.
561-LAD187.
14
(cont.)

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Rak364t1

Table des Matières