Twin-Star International 23MM1824 Manuel D'instructions page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Locate the left / right side panel (E,F) and Center
front/ back bar (L,M), Insert one Wood Dowel (CC)
into each of the pre-drilled holes. Push the side
panels snug to the center front/back bar (L,M) and
center shelf (K), Connect the front bar and the side
panels by connection plate, tighten Screw(DD)
through the pre-drilled holes. Using Bolt (AA)
through Washer (BB) to connect the center shelf
and side panels together.
Hardware Used
AA
Bolt
BB
Flat Washer
CC
Wood Dowel
4. Locate Hearth/Base (A) and set out fi nished side up
on the fl oor. Insert one Wood Dowel (CC) into each
of the pre-drilled holes. Attach the Completed
assembly from step 3 to the Hearth/Base (A). Make
sure the dowels are seated into the pre-drilled holes
in the Hearth/Base. Using Bolts (AA) and Washers
(BB) attach panels through the pre-drilled holes in
the mounting blocks.
Hardware Used
AA
Bolt
BB
Flat Washer
CC
Wood Dowel
5. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 4. Then locate Mantel/Top (G) and lay
fi nished side up on top of completed assembly.
From the inside, attach Mantel/Top (G) using Bolts
(AA) and Washers (BB) through the pre-drilled holes
in the mounting blocks.
HAND TIGHTEN ONLY.
Using Phillips head screwdriver tighten all Bolts
alternating top and bottom, left and right.
Hardware Used
AA
Bolt
BB
Flat Washer
CC
Wood Dowel
All manuals and user guides at all-guides.com
x 4
x 4
x 10
x 8
x 8
x 8
x 10
x 10
x 4
5
Fig. 3
DD
L
CC
M
F
BB
AA
Fig. 4
AA
BB
Fig. 5
G
CC
BB
AA
CC
E
A
CC
CC

Publicité

Table des Matières
loading

Table des Matières