Velleman VTLAN6 Mode D'emploi page 5

Testeur lan
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
1.
Se t the on/off switch [2] in the O N position. The indicator [1]
blinks.
To exe cute the test at a slowe r pace , se t the on/off switch in the
S ('slow') position. The indicator blinks slowe r.
2.
Inse rt one end of the cable unde r test into the socke t in the
maste r: [3] for R J45, [4] for RJ11/RJ12.
3.
Inse rt the othe r e nd of the cable into the sock e t in the remote
[7] for R J45, [8] for RJ11/RJ12.
The cable te st lights on the maste r [5] and on the remote [6]
light up in se que nce.
4.
Afte r testing, rem ove the cable from m aste r and rem ote and se t
the on/off switch in the O FF position.
5.2
Test results: exam ples
Descriptio n
Good conne ction: all indicators
light up in se que nce.
Note: Indicator G lights up
only for cables with a ground
(GND).
O pen circuit: wire 2 is broken,
indicator 2 doe s not light up on
maste r and remote.
O pen circuits: wire s 2 and 5
are broke n, indicators 2 and 5
do not light up on maste r and
re mote .
Note: If le ss than two wire s in
the cable are conne cted, none
of the indicators lights up.
V. 01 – 07/10/2013
VTLA N6
Sequence
maste r:
re mote :
maste r:
re mote :
maste r:
re mote :
maste r:
re mote :
maste r:
re mote :
maste r:
re mote :
5
1 2 3 4 5 6 7 8 G
(8P8C)
1 2 3 4 5 6 7 8 G
(8P8C)
1 2 3 4 5 6 (6P6C )
1 2 3 4 5 6 (6P6C )
1 2 3 4 (6P4C)
1 2 3 4 (6P4C)
1 2 (6P2C )
1 2 (6P2C )
1
2
3 4 5 6 7 8
1
2
3 4 5 6 7 8
1
2
3 4
5
6 7 8
1
2
3 4
5
6 7 8
©Ve lleman nv

Publicité

Table des Matières
loading

Table des Matières