Commissioning - Klarstein GUSTO CLASSICO Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMMISSIONING

1. Place the unit on a stable and level surface near a power outlet.
2. Install the drip tray and place the cup holder tray on it.
3. Remove the water tank, fill it with water and replace it.
Note: The water must be filled in between the MIN and MAX marks.
4. Place a cup or mug on the cup holder tray. Make sure that the steam switch and the
coffee switch are in the off position.
5. Insert the coffee sieve in the sieve holder, but do not yet fill in any coffee. Make sure
that the coffee sieve is properly engaged.
6. Place the cup or mug under the coffee outlet nozzles.
7.
Connect the machine's power cord to a power source.
8. Set the On/Off switch to the ON position and scrape the machine The power
indicator starts flashing red and the machine starts to heat up. When the heating
phase is complete, the red light is steady on.
9. Press the coffee switch upwards and the machine starts dispensing hot water. Slide
the coffee switch down to stop the water output.
10. When no more water is dispensed, remove the water tank, rinse it and clean the
cup or mug used. The coffee machine is now ready for use.
Note: If you wish to carry out a more thorough cleaning cycle of the internal parts of
the machine, use a vinegar-water solution in a ratio of 1:4 or a descaling product.
EN
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1003556410035565

Table des Matières