Télécharger Imprimer la page

Dell N20 Serie Guide De Mise En Route page 43

Publicité

Les langues disponibles

Les langues disponibles

Unpacking the N30xx Switch
Package Contents
When unpacking each switch, make sure that the following items are
included:
One Dell Networking switch
One RJ-45 to DB-9 female cable
One ReadyRail kit for rack installation, two mounting brackets, bolts, and
cage nuts
One set of self-adhesive rubber pads for the free-standing switch (four pads
are included)
One PSU
Unpacking Steps
NOTE:
Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
1 Place the container on a clean, flat surface and cut all straps securing the
container.
2 Open the container or remove the container top.
3 Carefully remove the switch from the container and place it on a secure
and clean surface.
4 Remove all packing material.
5 Inspect the product and accessories for damage.
Getting Started Guide
41

Publicité

loading