Télécharger Imprimer la page

Wacker Neuson PT2A Manuel D'utilisation page 25

Masquer les pouces Voir aussi pour PT2A:

Publicité

Les langues disponibles

Les langues disponibles

PT2A / PT3A / PT4A
4.4
Positioning and Preparing the Machine for Operation
WARNING
Personal injury hazard. Failure to follow the listed procedures may cause injury to
personnel or damage to the machine.
► All persons setting up the machine must be fully trained on the installation of the
machine.
Perform the procedure below to position and prepare the machine for operation.
Pre-operation
setup
1. Position the pump as near to the water as possible, on a firm, flat surface. Keep
the pump level.
2. Connect the suction hose (a) to the suction port (b).
■ Suction hoses must be rigid enough not to collapse.
■ At least two T-bolt clamps are recommended for connecting the suction hose
WARNING
Personal injury hazard. A loose connection between the suction hose and the
suction port can result in personal injury should the suction hose break loose while
the pump is operating.
► Only operate the machine when the suction hose is securely fastened to the
suction port.
This procedure continues on the next page.
wc_tx004594en.fm
to the suction port. Position the hose clamps at 90° intervals for best seal.
f
e
g
d
25
Operation
b
a
c
wc_gr014836

Publicité

loading

Ce manuel est également adapté pour:

Pt3aPt4a