3-9. NEOLIUM BOX 200/250/300 9.00m platform assembly
• Closely follow the whole of § 3-7 to assemble the NEOLIUM BOX 200/250/300 7.00m platform.
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 39, and then no. 34, by following § 3-1-6.
• Mount the box platform on rung no. 35 by following § 3-1-7.
106-A000035566 - ind.D - 11/2021
69