Télécharger Imprimer la page

Publicité

Liens rapides

Product Instructions
Viega System Pressurization Kit
Model 2873-5US
1
A
B
C
D
EN
System Pressurization Kit
Viega products are designed to be
installed by licensed and trained plumbing
and mechanical professionals who are
familiar with Viega products and their installation.
Installation by non-professionals may void
Viega LLC's warranty.
1
A. Any SVC fitting (compression PEX, press PEX,
or press copper)
B. SVC seat
C. Male hose thread
D. Female hose thread
Viega LLC
585 Interlocken Blvd.
Broomfield, CO 80021
Phone (800) 976-9819
www.viega.us
Installation
System Pressurization Kit connects in two ways:
Kit connects directly to a purge valve on the brass
manifold accessory kit or to purge valve on the
stainless manifold or injection station. Remove air
vent, but leave check valve attached to end cap.
When manifolds are being pressure tested without
an Injection Station or prior to boiler piping, brass
manifold ends may be capped with 1" NPT plugs
(included), or if stainless manifolds are being used,
you may plug the 1¼" union ends with included
1¼" x 1" reducers attached to 1" NPT plugs.
For jobs where manifolds have not yet been
installed, tubing may be pressurized directly. Screw
hose x SVC adapter piece (included) into the female
hose thread of the pressurization kit, and then
insert any SVC tubing adapter (sold separately). For
multiple circuits of tubing, temporarily connect all
circuits together with couplings, plug one end, and
attach pressurization kit to other end.
EN
Product Instructions
System Pressurization Kit
This document is subject to updates. For the most current Viega
technical literature please visit www.viega.us.
ES
Instrucciones del Producto
Conjunto de presurización
Este documento está sujeto a actualizaciones. Para consultar la más
reciente literatura técnica de Viega visitar www.viega.mx.
FR
Directives du Produit
Kit de mise sous pression du système
Ce document est soumis à des mises à jour. Pour consulter les
manuels techniques Viega les plus récents, consultez notre site
www.viega.ca.
PI-HC 520240 1119 System Pressurization Kit (EN ES FR)
Operations
During concrete pours and when the finish floor is
installed the radiant system must be pressure tested.
Check local codes for compliance or additional test
requirements.
Double check all connections to ensure proper seal.
Connect System Pressurization Kit to any purge
valve (or to tubing when manifolds are not yet
installed).
Pressurize system to 100 psi to detect any leaks.
The system should hold 100 psi for a minimum of
1 hour.
Maintain and monitor pressure during pouring of
concrete and installation of finish floor to simplify
leak detection.

Publicité

loading

Sommaire des Matières pour Viega 2873-5US

  • Page 1 Product Instructions System Pressurization Kit Product Instructions This document is subject to updates. For the most current Viega Viega System Pressurization Kit technical literature please visit www.viega.us. Instrucciones del Producto Conjunto de presurización Este documento está sujeto a actualizaciones. Para consultar la más reciente literatura técnica de Viega visitar www.viega.mx.
  • Page 2 Ver las ilustraciones en la página 1 Reportez-vous aux images à la page 1 Los productos de Viega están diseñados Les produits Viega sont conçus pour être installés par des plombiers et mécaniciens para ser instalados por plomeros y mecánicos profesionales, capacitados professionnels agréés et dûment formés...