Télécharger Imprimer la page

Little Giant APA-05-HAR Manuel Du Propriétaire page 12

Masquer les pouces Voir aussi pour APA-05-HAR:

Publicité

Les langues disponibles

Les langues disponibles

Figure 8
Secure 2 screws
hand-tight.
Step 6
Install fountain head/motor assembly into float.
a) Lower the motor end-first through the hole in the center of the float and into the water.
b) Rotate the pump/motor assembly so the power cord is oriented with the power cord channel in the float
(Figures 2 and 3).
c) Continue lowering until each support tube rests in its corresponding float recess.
d) Tuck power cord along channel of float until it exits from the float and into water.
e) Connect lanyard to eye-bolt of float (Figures 2 and 3).
Step 7
Restore electrical power.
a) Ensure all persons are removed from the water.
b) Remove the lock-out device at the power source.
c) Turn on power to the pump at the fuse box.
d) Connect the power cord directly into the outdoor-rated and grounded receptacle.
e) Verify the pump turns on and begins pumping water.
f)
Remove the power cord from the electrical supply if you need to turn the pump off.
g) The product should now be ready for operation. If the product does not operate properly,
consult the Troubleshooting section.
12
Tighten 4 Bolts to 50 in-lb
(with small arrows)
After splines
aligned, apply
small downward
force to push
impeller on shaft.
View underside
to align Impeller
splines to Motor
Shaft splines.
Figure 10
Nozzle Gasket
Figure 9
Insert Nozzle inside the
Water Plenum as shown.
Water Plenum
Water Plenum
Secure 4 screws
to 50 in-lb.

Publicité

loading

Produits Connexes pour Little Giant APA-05-HAR

Ce manuel est également adapté pour:

Apa-10-harFpa-05-k01Fpa-10-k01