Final Checklist - FULGOR ACCENTO Série Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9 - Final checklist

EN
To prevent improper connections leading to damage of
electrical components and so voiding the warranty, the
following steps must be performed:
1. Check the electrical requirements and make sure you have
the correct electrical supply and that the oven is properly
grounded.
2. Turn on the power supply to the oven.
3. Check power at the junction box wires using a voltmeter
having a range of 0-250V.
If you have installed the oven for use on 240V supply, you
should nd that the voltage reading between the black and
red wires (Line to Line) should be 220V to 240V.
If you have modied the oven(s) for use on 208V, the voltage
reading between the black and red wires should be 190 to
208V.
4. Set the clock by following these steps:
• Immediately turn [+/-] knob to set hours + [INC] or -
[DEC] .
• Press [+/-] knob again to change minutes.
• Immediately turn [+/-] knob to set minutes + [INC] or -
[DEC] .
• Press [+/-] knob or wait for a few seconds to confirm.
IMPORTANT
Leave these INSTALLATION instructions as well as the USE
AND CARE MANUAL with the owner.
24
CONNECTING TO 208 VOLT CIRCUIT
This option is provided for areas where standard 240V service
is not available. The following steps must be completed prior
to connecting the oven to the power source.
1. Remove the rear cover.
2. Connect the 208V Jumper provided into the female
connector as showed below.
3. Reassemble the rear cover, connect the oven to the 208V
power supply and check functionality.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Accento pro-range f4pdf366s1

Table des Matières