FULGOR ACCENTO Série Instructions D'installation page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4 - Installation Instructions
EN
STEP 9
After completing the electrical and gas connections (see
included instructions) measure the four corners in cutout area
to verify if flooring is level. Adjust the leveling legs to the desired
height and ensure range is level. Turn the bottom section of
each leg counter-clockwise to raise the leg and clockwise to
lower it.
IMPORTANT
When the unit first powers on, it must complete a safety door
lock test. Ensure doors are reinstalled if they were removed
to ease movement of the range prior to sending power to
the appliance. Do not open the oven door or attempt to
use the oven until you are sure the test has been completed
successfully. Opening / closing the door during the test
could result in damage to the lock mechanism. Refer to the
instruction manuals for more details if needed.
Ensure floor is protected. Slide unit into place making sure to
engage the anti-tip bracket.
10
STEP 10
Hook tabs on bottom of toekick into slots on either side of the
frame and rotate up until the magnets at the top of toekick
make contact and hold it in place securely

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Accento pro-range f4pdf366s1

Table des Matières