2. Connect the bipolar black cable with prods to the boiler's M2 board (fig. 6).
Boilers from inside
Fig. 6
3. Connect the probe wiring and thermostat to CN6 connector of BE08
Connect the prods to the M10 boiler board (fig. 7).
Connect the shielded cable connector (on the
Fig. 7
Connection to the
BAG
2
MIX sensor
46
INSTALLATOR
Boilers from inside
Boilers from outside
2
BAG
MIX
part) to the NTC probe and the other to the thermostat.
Boilers from outside
Connection to the
2
BAG
MIX sensor