CONFORMITY
BAG
2
MIX conforms to:
Low Voltage Directive 73/23/EEC
Electromagnetic Compatibility Directive 89/336/EEC
GENERAL
Warnings and safety considerations
Description of the equipment
Structure
Technical data
Dimensions and weight
Hidraulic circuit
Circulation unit
Wiring Diagrams
INSTALLATOR
Installation of the appliance
Typical installation layout
Hidraulic connections
Electrical connections
TECH SERVICE
First starting up
Circulation pump
Three-way mixing valve
Programming parameters
This instruction manual is an integral part of the manual for the boiler to which the BAG
See the latter manual for GENERAL WARNINGS and BASIC SAFETY RULES and other specific information on the
functioning of the boiler.
The following symbols are used at some points in the manual:
WARNING – for actions that call for particular caution and adequate training.
FORBIDDEN – for actions that MUST NOT be carried out under any circumstances
WARNINGS FOR THE USER:
This device does not require any setting or checking by the user.
Opening the front cover on the device is therefore forbidden.
Check the water pressure in the system from time to time. If necessary, alter the pressure as indicated in the instruction manual.
If the pressure drops frequently, call in professionally trained personnel to check the status of your system.
34
Page
35
"
36
"
36
"
36
"
36
"
37
"
37
"
38
Page
40
"
41
"
42
"
43
Page
48
"
48
"
48
"
48
2
MIX unit is connected.