!
CAUTION: At least two installers are
required due to the weight and size of the
hood.
Ceiling Joists
Wood Blocking
Top Support Frame
Support Frame Arm
Bottom Support Frame
Hood Body
FIG. A
the ceiling. Cut out internal shaded area of template to allow the ducting and electrical to pass through.
2. Remove screws securing top and bottom support frames together. Adjust support frame to accomodate the
3. Lift support frame assembly up to the ceiling making sure the word "front" on the top support frame faces the
cover the wood screws previously installed in the ceiling. Slide support frame towards narrow end of key
corners of the top support frame to secure it to the ceiling. Tighten all screws.
Bottom Support Frame
(secures to top of blower housing)
Key Holes
1
2
front - facing controls
3
B
4
Mounting Screws
(pre-installed)
Cut-Out Shaded Area
FIG. G
9
back
FIG. C
FRONT
A
XP022220
FIG. B