Télécharger Imprimer la page

Slackers ZIP-LINE Mode D'emploi Et Consignes De Sécurité page 18

Masquer les pouces Voir aussi pour ZIP-LINE:

Publicité

Les langues disponibles

Les langues disponibles

SLOPING COURSE ATTACHMENT HEIGHT GUIDELINE
General Set Up: Start point Height for Course (space between trees)
Course Length:
30.5 m
Initial Set Up
Start Point (In.):
335 cm
Maximum Slope
Height Reduction:
*Every course is different, examine the course clearances so the riders feet do not drag near the end of the course
60 cm
of drop
3. ATTACHING YOUR ZIPLINE
The installation should only be performed by an adult and in accordance with these instructions.
course cable comes with protective tubing for the bark of your tree.
• STEP 1: Loop cable around the Start Point Tree.
• Fully extend the turnbuckle and attach one turnbuckle end to the sling cable ends with the nut and bolt.
See install overview diagram on pg. 6.
• Take the looped eye end of the main cable and attach it to the other end of the turnbuckle (with the nut
and bolt).
• Unwind the course cable along the zipline course removing any twists.
• Thread the cable through the trolley, below the two trolley bearings and above the grips shaft.
• Wrap the sling cable end around your Finish Point tree.
27 m
24 m
320 cm
305 cm
137 cm 122 cm
107 cm
Start Point
21 m
18 m
15 m
290 cm
274 cm
259 cm
91 cm
76 cm
61 cm
End Point
12 m
9 m
244 cm
229 cm
198 cm
46 cm
30 cm
198 cm
Finish Point
Your
5

Publicité

loading