5.1.2 Wall Clearances; 5.1.3 Positioning The Tank - Buderus SU54/5 Notice D'installation Et D'entretien

Préparateur ecs
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.1.2 Wall clearances

Fig. 6 Recommended minimum wall clearances

5.1.3 Positioning the tank

▶ Unpack the tank by removing the wrap, wooden boards and foam pad
on the top.
▶ Lay the foam pad on the floor to serve as a mat.
Fig. 7 Unpacking the DHW tank
▶ Carefully place the DHW tank on the cover pad [1].
▶ Cut out the raised sections in the EPS bottom pad [2].
SU54.5 | SU80.5 | SU100.5 – 6 720 819 292 (2017/11)
▶ Unscrew the adjustable feet [3].
1.
2.
6 720 801 769-03.1ITL
Fig. 8 Lay down the DHW tank and expose the adjustable feet
▶ Position the DHW tank on a level floor with adequate load-bearing
capacity.
Fig. 9 Positioning the tank
6 720 800 035-04.1ITL
▶ Maintain minimum wall clearances.
▶ Adjust the adjustable feet so that the DHW tank is vertical.
5
Installation
3.
6 720 801 769-15.1ITL
6 720 801 769-13.1ITL
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Su80/5Su100/5Su80Su54Su100

Table des Matières