GreenWorks Pro SNC407 Manuel D'opérateur page 12

Souffkeuse à neige
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
2. Remove the nut (27).
3. Remove the 5 screws (24) and side wear pad(26) that
secure the left side cover (31).
4. Remove the belt (28).
5. Using a socket wrench, remove the large pulley (29).
English
6. Remove the screws (24) that secure the left side plate.
7. Pull the axle (30) and remove the old impeller, install the
new impeller.
8. Reinstall the nut (27) and right side cover.
32
29
9. Reinstall the left side plate (32), large pulley (29), belt
(28) and left side cover (31).
12
24
30
27
27
28
31
26
24

Publicité

Table des Matières
loading

Table des Matières