Télécharger Imprimer la page

CLAS OH 9001 Mode D'emploi page 5

Publicité

Les langues disponibles

Les langues disponibles

OH 9001
WHEEL DOLLY HGV
WARNING
• Study, understand and follow all instructions before operating this device. If the operator cannot read or understand
these instructions, the operating instructions and sefety precautions must be read and discussed in the operator's
native language.
• Wear eye protection.
• Inspect the dolly before each use; do not use the dolly if it's damaged, altered, or in poor condition
• No alternations can be made to this product
• Only attachements and/or adapters supplied by the manufacturer shall be used
• Do not exceed rated capacity
• Use only on a hard level surface
• Lifting device only. Immediately after lifting, support the load with appropriate means
• Before moving the load : center the load on the dolly; secure the load with the restraint chain; and lower the
dolly completely
• The use of this wheel dolly is limited to the removal, transportation, and installation of wheel assemblies. Don ot
lift or support vahicles with this wheel dolly.
• Stay clear of a lifted load
• The owner of the dolly is responsible for ensuring that procedures are followed according to federal, state, and
local safety regulations.
ASSEMBLY
1. Attach the 2 front casters to the horizontal weldment using four 8mmx18 screws and washers foreach caster.
2. Attach the rear caster to the screw rod outer tube assembly by placing 4 washers on the top of the assembly
plate; thread a bolt throught each washer, and thne through the assembly and caster plates. Hold each bolt in
place with a at washer, a lock washer, and an 8mm nut.
3. Place the crank assembly over the screw rod outer tube assembly. INsert a pin through the crank handle and the
screw rod ; hold the pin in place with a cotter pin.
4. Slide the horizontal weldment into the vertical weldment u-channel. Bolt the weldment together using two
12mmx110 bolts and 2 at washers on the top of the u-channel, and 2 at washers, 2 lock washers, and two
12mm nuts on the bottom.
5. Attach the crank assembly to the top of the u-channel using two 12mmx110 bolts and 2 at washers on the top
of the crank assembly and two12mm nuts on the bottom of the u-channel.
6. Secure the crank assembly to the vertical and horizontal weldments with another 12mmx110 bolt passing
through the bottom of the crank assembly, through the side of the u-channel, and into the horizontal weldment. Hold
bolt in place with 2 at washers, a lock washer and a 12mm nut. See illustration.
7. Attach straps to the horizontal weldment and then the verticla weldment using 2 bolts, 2 at washers and 2 nuts
on each pairs of straps. See illustration.
8. Place the jack between the raised stops on the crank assembly.
9. Attach the jack handle to the jack.
10. Place handle sleeves on the jack handle and on each end of the vertical weldment bar.

Publicité

loading